NEW LIFE CHAPEL

Cincinnati-Dayton Road, West Chester Township, OH

SPECIFICATIONS:

  • 17-acre site located in West Chester Township
  • 23,134 SF new construction with pre-cast panel exterior and standing seam metal roof
  • 550 seat main sanctuary 
NEW LIFE CHAPEL

Cincinnati-Dayton Road, West Chester Township, OH

SPECIFICATIONS:

  • 17-acre site located in West Chester Township
  • 23,134 SF new construction with pre-cast panel exterior and standing seam metal roof
  • 550 seat main sanctuary 

    Terrex builds new church in West Chester Township

    Terrex was selected by New Life Chapel to lead the construction of a new 23,200 SF church facility located at 8655 Cincinnati-Dayton Road in West Chester Township. This new project will includes a main sanctuary with seating for 550, and two story lobby space, kids areas with separate rooms for different age groups, coffee bar and cafe, and church leadership offices.

    Project Summary:

    • 17-acre site located at I-75 Cincinnati-Dayton Road interchange
    • 2-story lobby extends width of entire building
    • main sanctuary holds 550 people
    • cafe and coffee bar
    • kids club area with multiple rooms for different age groups
    • NLC leadership offices

    Terrex Services:
    conceptual budgeting, cost estimating, bidding, construction management

    Design Team:

    • Godwin + Associates Architecture
    • ChoiceOne Civil Engineering