Thrive

Completion Date: June 2017

 

RIVERSIDE DRIVE, CINCINNATI, OHIO

Terrex Construction helped Thrive with several projects for their building on Riverside Drive. The first was a masonry repair and stabilization of their building exterior, which dates from circa 1900. The second was a renovation of the 3rd floor of their building to expand their office space. The project encompassed approximately 5 ,000 SF and included structural modifications, new stair tower, kitchen area, and new overhead door that opens to dramatic views of the Ohio River.

Services: design-build, estimating, cost management, construction management

Project Architect: Costandi Studio

Structural: Schaefer